“Meticulous, quick and ready to support when needed! They were incredible and onsite right away for a minor flooding we had, gave their opinion and recommendations on next steps. Highly recommend.”
Waterproofingafter water damage
Membranes, barriers, and wet-room detailing so new finishes are not a second claim. We waterproof after the structure is dry — not over a still-wet assembly.
Call (778) 654-6742Call for waterproofing: (778) 654-6742Shield Water Damage Restoration and Repairs — Vancouver, operated by Felicita Holdings Ltd. · WorkSafeBC #201008694
- Live answer 24/7, no voicemail
- Crew on site in about 60 minutes
- Bonded, licensed and insured
- Direct insurance billing
Request waterproofing
After a flood, or to prevent the next one.
Why rebuild without waterproofing fails
Hanging drywall over the same leak path invites the next atmospheric river or shower failure
After dry-out
Waterproofing goes on a dry, sound substrate. We sequence it after moisture goals.
Wet rooms
Showers and baths get membranes — not paint on damp board.
Basements
Interior barriers and detailing where seepage found a path.
Same ticket
Specified while walls are open, built by the crew that saw the flood.
Waterproofing we install
Prevention as part of restoration
Showers and baths
- Pan and wall membranes
- Niches and curb detailing
- After a failed surround
- Tile over a proper assembly
Basements
- Interior moisture barriers
- After seepage or sump events
- Coordination with drainage
- Finished-suite protection
Kitchens and laundry
- Wet-area detailing at sinks
- Behind appliances that leaked
- Floor transitions
- Not a substitute for a plumber’s repair
What waterproofing is not
- Not a delay of extraction
- Not mould cover-up
- Not exterior foundation excavation unless scoped
- Written scope before we install
Dry first. Then close the path.
Waterproofing is phase two of restoration. We confirm the structure is dry, repair substrate, install membranes, then finish tile, drywall, or paint.
- Verify moisture readings on the assembly
- Repair substrate and detailing
- Install membranes and barriers as specified
- Finish the room so it is waterproof and complete

Waterproofing after water damage in Greater Vancouver
Insurance often pays to restore what was there. While walls are open you can choose a better wet-room assembly — that is a written upgrade, not a surprise invoice. Shield explains both options.
Basement waterproofing after repeated atmospheric river floods is one of the highest-value prevention steps we see. Ask for it on the same project as dry-out.
Customer stories
What our clients say
1 / 109
“Meticulous, quick and ready to support when needed! They were incredible and onsite right away for a minor flooding we had, gave their opinion and recommendations on next steps. Highly recommend.”
1 / 109
FAQ
Waterproofing FAQ
Shield — waterproofing across Greater Vancouver.
Do you waterproof before or after drying?
After. Membranes go on a dry, sound substrate. We sequence waterproofing after moisture goals, then finish tile or drywall.
Can I upgrade the shower membrane while walls are open?
Yes. Insurance typically restores what was there. A better wet-room assembly is a written upgrade on the same project.
Do you excavate foundations?
Interior moisture barriers and wet-room membranes are our restoration scope. Exterior excavation is only if separately specified after inspection.
Which areas do you serve?
Yes. We serve Vancouver, West Vancouver, North Vancouver, Burnaby, Richmond, New Westminster, Surrey, Coquitlam, and surrounding Greater Vancouver communities within ~50 km.
24/7 · Greater Vancouver
Close the leak path. Call Shield.
Waterproofing as part of restoration — Greater Vancouver
(778) 654-6742
