Felicita Holdings Ltd. · WorkSafeBC #201008694
Vancouver Mitigation & Contracting Price List
Every rate we charge for emergency water damage, drying, and rebuild across Vancouver and the Lower Mainland. All prices in Canadian dollars.
Any dispatch for active water, sewage, or storm water coming in. Any day, any hour.
Per technician on an emergency, until the site is stabilized. Also all mitigation work outside regular hours.
Per technician for booked mitigation work, Monday to Friday, 8am to 5pm.
Per technician, any hour. Replaces the emergency rate and is never added on top.
How we bill
Emergency water-damage mitigation, structural drying, and rebuild across Vancouver and the Lower Mainland, 24/7.
We bill time and materials. Invoices itemize labour hours, equipment days, materials, and any sub-trades, so every line can be checked against this list.
Insurance program rates apply when your insurer sends them within three business days of claim confirmation.
- All prices are in Canadian dollars (CAD), before applicable taxes.
- Regular hours are Monday to Friday, 8am to 5pm, excluding BC statutory holidays.
- Emergency labour is $250/hr per technician. It applies from arrival on an emergency call-out until the site is stabilized (water stopped, standing water extracted, drying equipment running), and to any mitigation work outside regular hours.
- After the site is stabilized, follow-up work booked during regular hours is billed at the scheduled rate of $149.70/hr per technician.
- Category 3 water (sewage and other contaminated water) is $350/hr per technician at any hour. It replaces the emergency rate; the two are never combined.
- Labour is billed per person, includes drive time, and is rounded to the nearest half hour.
- Call-out minimums are billed separately from labour, equipment, materials, and disposal.
- Equipment is billed per unit, for each day it stays on site.
- Materials and supplies are billed at cost + 20%. Landfill and disposal fees are billed at cost + 18%.
- Fuel surcharge: $12.50 per vehicle, per visit.
- A $500 deposit may be requested when an emergency call-out is booked.
- Payment is due on receipt. Overdue balances accrue 2% interest per month.
- Visa and Mastercard are accepted up to $1,000; a 3% surcharge applies above $1,000.
Mitigation
Stopping the damage: call-outs, extraction, drying, and specialty equipment.
Emergency Call-Out
Getting a crew to site. Billed separately from labour, equipment, and materials.
Emergency Water-Damage Call-Out
Active flooding, burst pipes, sprinkler discharge, sewage backup, or storm water coming in, at any hour. A higher minimum is quoted up front for large or complex losses.
Non-Emergency Inspection / Quote Visit
Booked visits during regular hours: new-client walkthroughs, moisture checks, and quote or insurance inspections.
Fuel / Mobilization Surcharge
Each vehicle on an emergency response, equipment delivery or pickup, or drying-monitoring visit.
Water Extraction & Mitigation Labour
Per person, per hour. Covers extraction, moisture mapping, drying setup, flood cuts, and removal of wet materials needed for drying.
Emergency Mitigation Labour
Every flood technician, extraction specialist, and supervisor on an emergency call-out, from arrival until the site is stabilized. Also any mitigation work after 5pm, overnight, on weekends, or on BC statutory holidays.
Scheduled Mitigation Labour
Booked mitigation work Monday to Friday, 8am to 5pm: follow-up drying checks, moisture readings, equipment moves, and planned removals.
Category 3 Water / Sewage Cleanup
Sewage backup, outside flood water, and other contaminated water, at any hour. Replaces the emergency rate rather than adding to it. PPE, disposal, and equipment billed separately.
Contents / Cleaning Support
Moving furniture and belongings and cleaning affected areas. Non-technical support only; same rate at any hour.
Drying & Dehumidification
Per unit, for each day it stays on site.
Mini Air Mover
Compact air movement for confined spaces and targeted drying.
Air Mover
High-velocity floor and wall drying.
Axial Fan
Large-volume air movement for bigger affected areas.
Dehumidifier
Standard moisture removal during drying.
Large Dehumidifier
High-capacity dehumidification for larger losses.
Air Scrubber
HEPA air filtration during mitigation. Does not include mold remediation or hazardous-material abatement.
Large Air Scrubber
Higher-capacity HEPA filtration for larger areas.
Injected Drying System
Drying inside wall cavities and under cabinets without full removal.
Hardwood Floor Rescue Mat System
Suction mats that pull water out of hardwood floors so they can be saved.
Specialty Equipment & Treatments
Billed only when used on your job.
Infrared Heat Panel
Power Distribution Box
Gas Pump
Gas Generator
ULV Fogging Machine
Electric Sump Pump
Sanitizing Steamer
Antimicrobial Application
$30 minimum for areas under 120 sq ft.
Bio Wash
Cleaning and disinfecting surfaces touched by sewage or contaminated water.
Contracting
Putting it back: rebuild trades, finishes, waterproofing, roofing, and demolition.
Contracting Labour
Rebuild and repair labour after drying, per person, per hour. Materials billed separately.
Project Manager / Superintendent
On-site coordination, scheduling, quality control, and client and adjuster communication.
Lead Finish Carpenter
Finish carpentry, trim, doors, built-ins, and detailed millwork.
General Carpenter / Remodeler
Framing repairs, rough carpentry, fixture blocking, and general rebuild work.
Drywall Specialist
Hang, tape, mud, texture match, and finish walls and ceilings.
Painter / Finisher
Prep, priming, cut-in, and finish coats with colour and sheen matching.
Flooring Specialist
Hardwood, engineered, tile, and carpet installation or repair.
Demolition / Soft Demo Labour
Selective demolition and material removal ahead of rebuild.
Skilled Helper / Labourer
Material handling, protection, cleanup, and crew support.
After-Hours / Weekend Contracting Labour
Any rebuild trade working evenings, overnight, weekends, or BC statutory holidays at your request or because of building access.
Contracting Project Minimum
Applies to rebuild and repair scopes. Small punch items can be quoted as fixed packages.
Drywall, Paint & Finishes
Labour per unit of wall or ceiling area. Materials billed separately.
Drywall Hang (1/2")
Hanging new drywall on walls after water damage.
Drywall Hang (5/8" / Fire-Rated)
Thicker or fire-rated board where code or the building requires it.
Tape, Mud & Finish (Level 4)
Standard paint-ready finish.
Texture Match / Specialty Finish
Added to the finish rate to match knockdown, orange peel, popcorn, or other textures.
Interior Wall Paint (2 coats)
Prep and two finish coats on walls. Paint billed separately.
Ceiling Paint (2 coats)
Prep and two finish coats, including cut-in at edges and fixtures.
Trim / Door Paint or Stain
Baseboard, casing, and door finishes with masking and detail work.
Flooring Restoration
Installation and repair labour after structural drying. Materials billed separately.
Hardwood / Engineered Install
Hardwood or engineered flooring installation.
Hardwood Repair / Partial Replace
Replacing damaged boards and blending them into the existing floor.
Tile Install (Floor)
Ceramic, porcelain, or stone floor tile, including layout.
Tile Install (Wall / Wet Area)
Bathroom and kitchen wall tile with waterproofing membrane.
Carpet / Pad Install
Replacement carpet and pad.
Subfloor Repair / Replace
Plywood or underlayment repair before finish flooring.
Kitchen & Bath
Cabinet and fixture labour for water-damaged kitchens and bathrooms.
Cabinet Install / Rehang
Upper and base cabinets, installed or rehung after drying and wall repair.
Vanity Install
Standard vanity, anchored and levelled. Plumbing billed separately.
Countertop Template & Install Coordination
Templating and install labour for stone or solid-surface tops. Fabrication billed by the supplier.
Toilet Reset / Replace Labour
Remove and reset or replace a toilet with a new wax seal. Fixture cost separate.
Faucet / Fixture Install Labour
Sink, tub, or shower fixtures. Fixture cost and rough plumbing separate.
Tile Shower / Tub Surround Rebuild
Backer board, waterproofing, and tile labour for wet-area rebuilds.
Waterproofing
Keeps water from coming back after the rebuild.
Interior Crack Injection
Epoxy or polyurethane injection of foundation or slab cracks.
Interior Drainage / Channel System
Interior perimeter drain labour. Sump, pump, and materials billed as scoped.
Vapour Barrier / Moisture Membrane
Interior vapour barrier or under-slab membrane labour.
Exterior Foundation Membrane Labour
Membrane labour where the exterior foundation can be excavated.
Waterproofing Project Minimum
Applies to standalone waterproofing jobs. Combined rebuild packages can be quoted as a fixed scope.
Roofing
Installed prices per sq ft of roof, including materials, labour, tear-off, and disposal. Pitch, height, access, and layers removed set where a job falls in the range; you get a fixed written quote before work starts.
Asphalt Shingles
Architectural Shingles
Metal Standing Seam (Steel)
Metal Standing Seam (Aluminum)
Metal, Exposed Fastener
Metal Shingles
Flat Roof (TPO / EPDM Membrane)
Cedar Shake
Tile or Slate
Synthetic Roofing
Tear-Off Only
Removal of existing roofing when no new roof is installed by us.
Roof Repair (Patch, Flashing, Leaks)
Roofing Supervisor
Roofing Labourer
Demolition, Debris & Hazardous Materials
Flood cuts and wet-material removal during mitigation are billed as mitigation labour, and sewage-contaminated removal at the Category 3 rate. These rates cover everything else.
Planned Interior Strip-Out
Dry, non-contaminated interiors. Fixed price quoted after a walkthrough.
Residential Demolition
Planned demolition of dry, accessible structures. Fixed price quoted after a walkthrough.
Commercial Demolition
Planned commercial demolition. Fixed price quoted after a walkthrough.
Demolition Equipment Operator
Machine operation where the scope needs heavy equipment.
Debris Bag-Out & Haul
Our crew loads and hauls debris. Wet, heavy, or regulated waste may need separate handling.
Dumpster, 20 yd
Dumpster, 30 yd
Dumpster, 40 yd
Landfill & Disposal Fees
Transfer-station, landfill, and hazardous-waste fees.
Hazmat Testing & Report
Required before disturbing suspect materials (asbestos, lead, mold) in older buildings. Priced by number of samples.
Asbestos Abatement
Only where testing confirms asbestos. Mold and lead work is quoted by scope after testing.
Permit Processing
Our processing fee. Municipal fees, engineering, and drawings billed separately.
Green Demolition Deposit
Held where the City requires it for qualifying pre-1950 homes.
Site Protection & Project Costs
Common project charges for occupied Vancouver homes and buildings.
Floor & Contents Protection
Ram board, plastic containment, and furniture protection in occupied spaces.
Dust Containment / ZipWall Setup
Temporary barriers that isolate work areas in condos, townhomes, and houses.
Material Procurement Markup
Fixtures, finishes, and materials we purchase and stage for your job.
Restricted Building Access Premium
Added to regular-hours contracting labour when strata rules, elevator bookings, or access windows constrain the schedule. Not added to the $225/hr after-hours rate.
Water coming in right now?
Call our 24/7 line. A crew is dispatched at the emergency rates above.
Rates effective October 2026, in Canadian dollars before applicable taxes. Final pricing depends on site conditions, access, timing, contamination, materials, scope, and written authorization. Felicita Holdings Ltd. | 828 Cardero St, Vancouver, BC V6G 2G5